العربية

Our Projects

Our Projects

M&A for glass factory

Modern Concrete Company Location: Sadat City industrial area Specialty: Glass Factory The latest special Glass manufacturing factory in the latest industrial landmark compound in Sadat City Construction of a complete complex for glass manufacturing consisting of several Halls, Of an approximate area = 50000 m2. PROCESSING HALL OF AREA = 13000 M2 2 POST MANUFACTURING …

M&A for glass factory Read More »

Butterfly for Textiles

Modern Concrete Company Location: 10th of Ramadan – Industrial Area Specialty: Textiles Factory The latest contracted project in the 10th of Ramadan region for MCC is Butterfly for textile Construction of the project consists of A Full Precast integrated factory as follows: A specialized precast hall for producing textiles manufacturing area of approximately = 11000 …

Butterfly for Textiles Read More »

Boundary Fences

Modern Concrete Company Length Completed City Country 780 L.M. 2022 10th of Ramadan Egypt

City Centre Almaza

Modern Concrete Company All roof slabs for Almaza city Center Mall were constructed by Pre-stressed Hollow Core slabs supplied and installed by Modern Concrete. Area Completed City Country 45,000 M2 2017 Almaza, Heliopolis. Egypt

Block & Interlock

Modern Concrete Company Modern Concrete company has added to its products a new generation with modern technologies to obtain new patterns of tiling that give limitless options for floor finishing of all tile sizes. These products are characterized by the following characteristics https://modern4concrete.com/wp-content/uploads/2023/01/modern.mp4#t=2 Washed tiles: This type of tiles is characterized by the use of …

Block & Interlock Read More »

005-1

Olympic stadium

Seawater desalination plant project
Project location: El Alamein city
Project value: EGP 9,057,656
Precast concrete ballasted block

Farag Textile

Modern Concrete Company Total precast covered areas = 114,000 M2 (6) Nos. of Textile Production halls with total area = 28,200 M2 , (Each hall consists of Ground Floor, Mezzanine & First floor = 4,700 M2). Dyeing hall = 20,157 M2 consists of GF, Mezz. & (2) floors. Boilers hall: GF only = 733 M2. …

Farag Textile Read More »

Others

Modern Concrete Company

Scroll to Top
Scroll to Top